aboutsummaryrefslogtreecommitdiff
path: root/kernel/softirq.c
diff options
context:
space:
mode:
authorVenkatesh Pallipadi <venki@google.com>2011-02-10 10:23:27 +0100
committerAK <andi@firstfloor.org>2011-03-31 11:58:01 -0700
commitfd72c5feeb61857dbcc4fac1c98157925fbb085e (patch)
tree9a3bf2ec55ffe3d1ce0ee38ec41dc15cf1d7f36b /kernel/softirq.c
parenta3fe22ee824895aafdc1b788e19c081a2e6dd9da (diff)
sched: Remove irq time from available CPU power
Commit: aa483808516ca5cacfa0e5849691f64fec25828e upstream The idea was suggested by Peter Zijlstra here: http://marc.info/?l=linux-kernel&m=127476934517534&w=2 irq time is technically not available to the tasks running on the CPU. This patch removes irq time from CPU power piggybacking on sched_rt_avg_update(). Tested this by keeping CPU X busy with a network intensive task having 75% oa a single CPU irq processing (hard+soft) on a 4-way system. And start seven cycle soakers on the system. Without this change, there will be two tasks on each CPU. With this change, there is a single task on irq busy CPU X and remaining 7 tasks are spread around among other 3 CPUs. Signed-off-by: Venkatesh Pallipadi <venki@google.com> Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl> Signed-off-by: Andi Kleen <ak@linux.intel.com> LKML-Reference: <1286237003-12406-8-git-send-email-venki@google.com> Signed-off-by: Ingo Molnar <mingo@elte.hu> Signed-off-by: Mike Galbraith <efault@gmx.de> Acked-by: Peter Zijlstra <a.p.zijlstra@chello.nl> Signed-off-by: Greg Kroah-Hartman <gregkh@suse.de>
Diffstat (limited to 'kernel/softirq.c')
0 files changed, 0 insertions, 0 deletions